ChrystalPaths
Well-Known Member
- Joined
- Aug 31, 2003
- Messages
- 8,277
- Reaction score
- 1
Here are some pics from their work yesterday. I was amazed how much they did in 4 hrs. They set up8 sheets of luan on the floor and duct taped it together then set up 2 saw work areas to cut the materials. They got the island framed and set yesterday as well as one layer on the wall side and cupboards set also.
Then they came this morning at 8:15. They just left for lunch. Both are all framed and prepped and the formica is cut to size. They have put glue on the edging and will return (Ihope) soon. Keep in mind that I (and yup I am proud of me) painted the boxes and polyed the hickory doors all by myself.
I'm sorry I did not mean to put this on the front forum, please move to the back porch.
Then they came this morning at 8:15. They just left for lunch. Both are all framed and prepped and the formica is cut to size. They have put glue on the edging and will return (Ihope) soon. Keep in mind that I (and yup I am proud of me) painted the boxes and polyed the hickory doors all by myself.
I'm sorry I did not mean to put this on the front forum, please move to the back porch.
Last edited by a moderator: